Bathroom - WD24
A very unique project as the customer had to go away and left it completely to us to choose all aspects of the bathroom including tiles, sanitary ware etc and only saw it for the first time 2 weeks after it was completed!
After making necessary repairs to floor joists, subfloor material, walls and modifying pipe locations the install could begin.
A bespoke timber countertop / end panel was created for the matt black basin and gold tap to mount to, custom cistern shelf, bespoke boxing with boarding and tanking with custom niche including bling gold backing tiles, new back to wall toilet, matt black shower enclosure with matching black dual thermo shower.
Circular heated mirror with full colour/brightness control LED lighting installed above the basin area.
Finished with complimenting LVT flooring installed along with black tile edging.







