WC Washroom - LU6

Upstairs cloakroom/wc renovated including all demo work, removal, revising and adding waste/pipework, plastering, new LED lighting and wall/floor tiling.

The flooring also needed strengthening with additional noggins, 12mm WBP ply and 6mm Hardiebacker. This was topped with DITRA membrane before tiling.

Photo 22-02-2019, 20 44 13.jpg
Photo 03-07-2019, 09 47 06.jpg
Photo 03-07-2019, 09 51 50.jpg
Photo 03-07-2019, 11 51 02.jpg
Photo 03-07-2019, 11 51 00.jpg
Less is more and easy on the eye...

Less is more and easy on the eye...

The customer wanted to add a basin to the room in the corner. We planned the room and suggested this could be integrated into the storage cupboard area. As it’s a small room, this freed up valuable space and compliments the design. With chased waste and feeds including isolators and a waterless HEP space-saving trap including the top most tile is removable to allow access to pipework.

Photo 01-08-2019, 13 00 06.jpg
Photo 24-07-2019, 12 44 11.jpg
Photo 02-08-2019, 15 55 06.jpg
Photo 24-07-2019, 18 11 34.jpg
Photo 12-08-2019, 12 48 21.jpg
Photo 28-08-2019, 19 02 11.jpg
Photo 28-08-2019, 19 02 44.jpg