WC Washroom - LU6
Upstairs cloakroom/wc renovated including all demo work, removal, revising and adding waste/pipework, plastering, new LED lighting and wall/floor tiling.
The flooring also needed strengthening with additional noggins, 12mm WBP ply and 6mm Hardiebacker. This was topped with DITRA membrane before tiling.






Less is more and easy on the eye...
The customer wanted to add a basin to the room in the corner. We planned the room and suggested this could be integrated into the storage cupboard area. As it’s a small room, this freed up valuable space and compliments the design. With chased waste and feeds including isolators and a waterless HEP space-saving trap including the top most tile is removable to allow access to pipework.